CASE STUDY  Derelict urban hospital 

The Brief: 

To provide clean silent power for the set lighting on location at a disused London hospital. Reducing the run time of the generator , its carbon emissions, fuel and costs across the four-week period. 

The Solution: 

Implemented a hybridised system using Zenobe’s 100kw/160kwh second-life battery with a Super Silent Stage V 100kVA generator. Working with the gaffer and his team, the battery supplied the power to the set lighting at the disused Ravenscourt Hospital set in a dense urban and residential location. 
 
To avoid noise disturbance, a silent power solution was key. With no available grid power, the Stage V generator was only used to recharge the battery automatically kicking in when the battery was at a 20% charge. This also provides the added benefit of supplying an UPS (uninterrupted power source!) 

The Outcome: 

By adopting a hybridised battery system in replacement of a traditional diesel generator the generator run time was reduced by an amazing 80%. This also meant that the fuel consumption was reduced by an incredible 54%! 

The Savings: 

This residential location wasn’t subjected to noise and air pollution during 4 weeks of filming, as this sustainable silent power system dramatically reduced the production’s carbon footprint but saving over 3 tonnes of CO2 emissions! The production also benefited from substantial cost savings by saving over £5200 in HVO fuel had the generator been the only power source. By creating a hybridised power system with the battery, the generator run time was reduced by 80%, saving them £2446 in HVO fuel! 

Equipment run time 

Equipment 
Value 
Battery 
522 Hours 
Generator 
104 Hours 
Generator % 
20% 

Projected diesel savings without a hybridised battery system 

Type 
Fuel Recorded 
Emissions Savings KG (CO2) 
3216KG 
Diesel Cost Savings Equivalent 
£1,835.00 

Hvo savings with a hybridised battery system 

Type 
Fuel Recorded 
Predicted hvo usage without battery (litres) 
2262 L 
Hvo usage with battery (litres) 
1039 L 
Hvo Savings (Litres) 
1223 L 
Fuel Savings 
54% 
Hvo Cost Savings 
£2,446 
Emissions Savings (CO2) 
238KG 

Energy Consumption & Load Profile   

Energy consumption 

Total Consumption: 3.4 MWh 
Average Daily: 132 Kwh 
Average Weekly: 859 Kwh 

Project Load - Profile Description 

Entire Project Peak Load: 57 kW 
Entire Project Average Load: 7 kW 
Figure 1 – Load Profile conveying a typical week 
Figure 1 depicts the site and generator load profile over an average week. The peak load for this week was 57kW.  
 
The average load was 12kW a slight increase from the entire project average site load of 7kW.